2017 GMC Yukon Denali
$32,000
Vehicle Details
VIN
1GKS2CKJ9HR168595
Year of Manufacture
2017
Make
GMC
Model
Yukon
Trim
Denali
Type
SUV
Mileage
116,050
Drivetrain
4x4
Exterior Color
Gray
Fuel type
Flexible-Fuel
Transmission
Automatic
Engine
6.2L V8 OHV 16V
Vehicle photos

Vehicle Location
78641 United States
Availability
It’s available now
Car is immediately available.
Vehicle Condition by Seller
Excellent
Excellent mechanical condition. Looks new.
Damage Report
1 Damage
The seller has marked 1
location on the car
damaged. Request more information from seller
/raw/c3416a14-aa3a-4e0b-93d2-b43b479d4014.jpg)
/raw/ba3d0bed-d60b-4d80-ba8d-e7bc96878b90.jpg)
/raw/c7e61d0b-9f2d-423f-9257-e6867ddda7c8.jpg)
/raw/e258e70d-136b-4b9e-85b4-0590f3996c5d.jpg)
/raw/29376f79-073b-47f9-9f07-2b27ecdc62f6.jpg)
/raw/9d1c0694-df1d-4aca-b858-53f25fb820e5.jpg)
/raw/551ba221-6ee2-4b1c-8d97-5515482aa194.jpg)
/raw/097854b2-d099-4344-8191-4ce88b49f59b.jpg)
/raw/cf2c4acf-2522-47c9-a96c-909ed845d6da.jpg)
/raw/86833013-9c00-4df8-b1af-e84a6453cf03.jpg)
/raw/8ce8c091-81b9-4ff6-a9ad-7f7e88df3e8d.jpg)
/raw/9b1ae49e-d3d5-418b-9174-11d911f36261.jpg)
/raw/36d75e0c-075c-4bc3-98ff-7634b5d71d45.jpg)
/raw/4588a8dc-0298-4e21-9c48-31954d9346ab.jpg)
/raw/beefd807-a389-4969-aadc-0e37f0f07b0b.jpg)
/raw/a5226c56-2543-4d64-845f-8268c0d42672.jpg)